April 3rd ~ 9th 2006

Floor Joists, Steel Beams and Pitched Roofs

This is how the back of the house/extension looked on the 3rd April

and this is how it looked on the 6th April    

The Steel Beams insitu, ready for the outside bedroom wall to be built on it. Alannah through the Floor Joists. Half of the window you can see above will become the new bedroom doorway and the rest will be bricked up to form the bedroom wall.

Above you can see Brendan pitching the Garage Roof.

TOP: is a view of the side of the extension and BELOW: are the roof tiles, all of which had to be carried up onto the roof